Porsche logo

Porsche 718 Cayman GT4

Silver · Petrol · 2022 · 3,995 cc

V1 CNMMOT history

V1 CNM is a silver petrol Porsche 718 Cayman GT4 first used on 17 Sept 2022. Its MOT is valid until 16 Sept 2027 and it has passed 2 of 2 MOT tests, with 1,790 miles recorded at the latest.

From DVSA MOT records, updated 8 Sept 2026.

MOT
Valid
Until 16 Sept 2027
Mileage
1,790 mi
At MOT on 8 Sept 2026
MOT tests
2
2 passed · 0 failed
Per year
Not enough data
Get reminders for V1 CNM in the free Driver Codes app

Vehicle details

Registration
V1 CNM
Registration format
Prefix (1983 to 2001)
Make
Porsche
Model
718 Cayman GT4
Colour
Silver
Fuel type
Petrol
Engine size
3,995 cc
Year of manufacture
2022
First used
17 Sept 2022
MOT status
MOT valid until 16 Sept 2027
Latest MOT test
8 Sept 2026 (Pass)

Mileage history

V1 CNM was last recorded at 1,790 miles on 8 Sept 2026, 294 miles more than at the previous MOT on 15 Sept 2025.

Odometer reading at each MOT testPass
Previous MOT
1,496 miles · 15 Sept 2025
Between the last two tests
294 miles

Recorded mileage by year

  • 2026 – 1,790 miles
  • 2025 – 1,496 miles

What the latest MOT found

Pass1,790 miles

No defects or advisories were recorded.

What MOT advisories mean

Full MOT history

2 tests since 15 Sept 2025, newest first. Select a test to see every defect and advisory.

  1. Pass1,790 miles (+294)
    MOT expiry
    16 Sept 2027
    Odometer
    1,790 miles
    Test number
    916643436899

    No defects or advisories recorded.

  2. Pass1,496 miles
    MOT expiry
    16 Sept 2026
    Odometer
    1,496 miles
    Test number
    317157186467

    No defects or advisories recorded.

Questions about V1 CNM

Does V1 CNM currently have a valid MOT?
Yes. DVSA records show the MOT on V1 CNM is valid until 16 Sept 2027.
When is the MOT due on V1 CNM?
The MOT on V1 CNM is valid until 16 Sept 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has V1 CNM done?
V1 CNM was recorded at 1,790 miles at its MOT on 8 Sept 2026.
Has V1 CNM ever failed its MOT?
No. V1 CNM has passed all 2 of its MOT tests on record.
Has the mileage on V1 CNM ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on V1 CNM find?
V1 CNM passed its latest MOT on 8 Sept 2026 with no defects or advisories recorded.

Browse all V1C registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.