Volvo logo

Volvo XC60 R-Design B4 Mhev AWD Auto

Grey · Electric diesel · 2022 · 1,969 cc

S9 CWNMOT history

S9 CWN is a grey electric diesel Volvo XC60 R-Design B4 Mhev AWD Auto first used on 27 Jan 2022. Its MOT is valid until 26 Jan 2027 and it has passed 2 of 2 MOT tests, with 42,969 miles recorded at the latest.

From DVSA MOT records, updated 20 Jan 2026.

S9 CWN grey Volvo XC60 – car details, MOT history and tax status
Illustration of a Volvo XC60, not a photo of this vehicle
MOT
Valid
Until 26 Jan 2027
Mileage
42,969 mi
At MOT on 20 Jan 2026
MOT tests
2
2 passed · 0 failed
Per year
Not enough data
Get reminders for S9 CWN in the free Driver Codes app

Vehicle details

Registration
S9 CWN
Registration format
Prefix (1983 to 2001)
Make
Volvo
Model
XC60 R-Design B4 Mhev AWD Auto
Colour
Grey
Fuel type
Electric diesel
Engine size
1,969 cc
Year of manufacture
2022
First used
27 Jan 2022
MOT status
MOT valid until 26 Jan 2027
Latest MOT test
20 Jan 2026 (Pass)

Mileage history

S9 CWN was last recorded at 42,969 miles on 20 Jan 2026, 10,803 miles more than at the previous MOT on 22 Jan 2025.

Odometer reading at each MOT testPass
Previous MOT
32,166 miles · 22 Jan 2025
Between the last two tests
10,803 miles

Recorded mileage by year

  • 2026 – 42,969 miles
  • 2025 – 32,166 miles

What the latest MOT found

Pass42,969 miles

No defects or advisories were recorded.

What MOT advisories mean

Full MOT history

2 tests since 22 Jan 2025, newest first. Select a test to see every defect and advisory.

  1. Pass42,969 miles (+10,803)
    MOT expiry
    26 Jan 2027
    Odometer
    42,969 miles
    Test number
    601312958795

    No defects or advisories recorded.

  2. Pass32,166 miles
    MOT expiry
    26 Jan 2026
    Odometer
    32,166 miles
    Test number
    131283750815

    No defects or advisories recorded.

Questions about S9 CWN

Does S9 CWN currently have a valid MOT?
Yes. DVSA records show the MOT on S9 CWN is valid until 26 Jan 2027.
When is the MOT due on S9 CWN?
The MOT on S9 CWN is valid until 26 Jan 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has S9 CWN done?
S9 CWN was recorded at 42,969 miles at its MOT on 20 Jan 2026.
Has S9 CWN ever failed its MOT?
No. S9 CWN has passed all 2 of its MOT tests on record.
Has the mileage on S9 CWN ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on S9 CWN find?
S9 CWN passed its latest MOT on 20 Jan 2026 with no defects or advisories recorded.

Browse all S9C registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.