
Volvo XC40 + B3 Mhev Auto
Blue · Hybrid electric (clean) · 2023 · 1,969 cc
S90 MYCMOT history
S90 MYC is a blue hybrid electric (clean) Volvo XC40 + B3 Mhev Auto first used on 5 Mar 2023. Its MOT is valid until 28 Sept 2027 and it has passed 2 of 2 MOT tests, with 24,033 miles recorded at the latest.
From DVSA MOT records, updated 29 Sept 2026.

- MOT
- Valid
- Until 28 Sept 2027
- Mileage
- 24,033 mi
- At MOT on 29 Sept 2026
- MOT tests
- 2
- 2 passed · 0 failed
- Per year
- Not enough data
Vehicle details
- Registration
- S90 MYC
- Registration format
- Prefix (1983 to 2001)
- Make
- Volvo
- Model
- XC40 + B3 Mhev Auto
- Colour
- Blue
- Fuel type
- Hybrid electric (clean)
- Engine size
- 1,969 cc
- Year of manufacture
- 2023
- First used
- 5 Mar 2023
- MOT status
- MOT valid until 28 Sept 2027
- Latest MOT test
- 29 Sept 2026 (Pass)
Mileage history
S90 MYC was last recorded at 24,033 miles on 29 Sept 2026, 3,702 miles more than at the previous MOT on 4 Mar 2026.
- Previous MOT
- 20,331 miles · 4 Mar 2026
- Between the last two tests
- 3,702 miles
Recorded mileage by year
- 2026 – 24,033 miles
What the latest MOT found
No defects or advisories were recorded.
Full MOT history
2 tests since 4 Mar 2026, newest first. Select a test to see every defect and advisory.
Pass24,033 miles (+3,702)
- MOT expiry
- 28 Sept 2027
- Odometer
- 24,033 miles
- Test number
- 147195248524
No defects or advisories recorded.
Pass20,331 miles1 advisory
- MOT expiry
- 4 Mar 2027
- Odometer
- 20,331 miles
- Test number
- 289026786439
- AdvisoryFront Tyre worn close to legal limit/worn on edge both sides (5.2.3 (e))
Questions about S90 MYC
- Does S90 MYC currently have a valid MOT?
- Yes. DVSA records show the MOT on S90 MYC is valid until 28 Sept 2027.
- When is the MOT due on S90 MYC?
- The MOT on S90 MYC is valid until 28 Sept 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
- What mileage has S90 MYC done?
- S90 MYC was recorded at 24,033 miles at its MOT on 29 Sept 2026.
- Has S90 MYC ever failed its MOT?
- No. S90 MYC has passed all 2 of its MOT tests on record.
- Has the mileage on S90 MYC ever gone down?
- No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
- What did the latest MOT on S90 MYC find?
- S90 MYC passed its latest MOT on 29 Sept 2026 with no defects or advisories recorded.
Related registrations
Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.