Honda logo

Honda CR-V

Grey · Hybrid electric (clean) · 2022 · 1,993 cc

LR22 ZBEMOT history

LR22 ZBE is a grey hybrid electric (clean) Honda CR-V first used on 21 Apr 2022. Its MOT is valid until 20 Apr 2027 and it has passed 2 of 2 MOT tests, with 51,803 miles recorded at the latest.

From DVSA MOT records, updated 9 Apr 2026.

LR22 ZBE grey Honda Cr-V – car details, MOT history and tax status
Illustration of a Honda Cr-V, not a photo of this vehicle
MOT
Valid
Until 20 Apr 2027
Mileage
51,803 mi
At MOT on 9 Apr 2026
MOT tests
2
2 passed · 0 failed
Per year
Not enough data
Get reminders for LR22 ZBE in the free Driver Codes app

Vehicle details

Registration
LR22 ZBE
Registration format
Current format (from 2001)
Make
Honda
Model
CR-V
Colour
Grey
Fuel type
Hybrid electric (clean)
Engine size
1,993 cc
Year of manufacture
2022
First used
21 Apr 2022
MOT status
MOT valid until 20 Apr 2027
Latest MOT test
9 Apr 2026 (Pass)

Mileage history

LR22 ZBE was last recorded at 51,803 miles on 9 Apr 2026, 10,985 miles more than at the previous MOT on 11 Apr 2025.

Odometer reading at each MOT testPass
Previous MOT
40,818 miles · 11 Apr 2025
Between the last two tests
10,985 miles

Recorded mileage by year

  • 2026 – 51,803 miles
  • 2025 – 40,818 miles

What the latest MOT found

Pass51,803 miles

No defects or advisories were recorded.

What MOT advisories mean

Full MOT history

2 tests since 11 Apr 2025, newest first. Select a test to see every defect and advisory.

  1. Pass51,803 miles (+10,985)
    MOT expiry
    20 Apr 2027
    Odometer
    51,803 miles
    Test number
    355440869765

    No defects or advisories recorded.

  2. Pass40,818 miles
    MOT expiry
    20 Apr 2026
    Odometer
    40,818 miles
    Test number
    186207513870

    No defects or advisories recorded.

Questions about LR22 ZBE

Does LR22 ZBE currently have a valid MOT?
Yes. DVSA records show the MOT on LR22 ZBE is valid until 20 Apr 2027.
When is the MOT due on LR22 ZBE?
The MOT on LR22 ZBE is valid until 20 Apr 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has LR22 ZBE done?
LR22 ZBE was recorded at 51,803 miles at its MOT on 9 Apr 2026.
Has LR22 ZBE ever failed its MOT?
No. LR22 ZBE has passed all 2 of its MOT tests on record.
Has the mileage on LR22 ZBE ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on LR22 ZBE find?
LR22 ZBE passed its latest MOT on 9 Apr 2026 with no defects or advisories recorded.

Browse all LR22Z registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.