Volkswagen logo

Volkswagen T-ROC R TSI 4MOTION S-A

Blue · Petrol · 2022 · 1,984 cc

T9 AEKMOT history

T9 AEK is a blue petrol Volkswagen T-ROC R TSI 4MOTION S-A first used on 31 Jul 2022. Its MOT is valid until 30 Jul 2027 and it has passed 2 of 2 MOT tests, with 26,747 miles recorded at the latest.

From DVSA MOT records, updated 14 Jul 2026.

MOT
Valid
Until 30 Jul 2027
Mileage
26,747 mi
At MOT on 14 Jul 2026
MOT tests
2
2 passed · 0 failed
Per year
Not enough data
Get reminders for T9 AEK in the free Driver Codes app

Vehicle details

Registration
T9 AEK
Registration format
Prefix (1983 to 2001)
Make
Volkswagen
Model
T-ROC R TSI 4MOTION S-A
Colour
Blue
Fuel type
Petrol
Engine size
1,984 cc
Year of manufacture
2022
First used
31 Jul 2022
MOT status
MOT valid until 30 Jul 2027
Latest MOT test
14 Jul 2026 (Pass)

Mileage history

T9 AEK was last recorded at 26,747 miles on 14 Jul 2026, 4,550 miles more than at the previous MOT on 16 Jul 2025.

Odometer reading at each MOT testPass
Previous MOT
22,197 miles · 16 Jul 2025
Between the last two tests
4,550 miles

Recorded mileage by year

  • 2026 – 26,747 miles
  • 2025 – 22,197 miles

What the latest MOT found

Pass26,747 miles
  • AdvisorySills not checked as plastic covers
  • AdvisoryUnder trays fitted

What MOT advisories mean

Full MOT history

2 tests since 16 Jul 2025, newest first. Select a test to see every defect and advisory.

  1. Pass26,747 miles (+4,550)2 advisories
    MOT expiry
    30 Jul 2027
    Odometer
    26,747 miles
    Test number
    983587434700
    • AdvisorySills not checked as plastic covers
    • AdvisoryUnder trays fitted
  2. Pass22,197 miles2 advisories
    MOT expiry
    30 Jul 2026
    Odometer
    22,197 miles
    Test number
    812495721962
    • AdvisoryNearside Rear Tyre worn close to legal limit/worn on edge (5.2.3 (e))
    • AdvisoryOffside Rear Tyre worn close to legal limit/worn on edge (5.2.3 (e))

Questions about T9 AEK

Does T9 AEK currently have a valid MOT?
Yes. DVSA records show the MOT on T9 AEK is valid until 30 Jul 2027.
When is the MOT due on T9 AEK?
The MOT on T9 AEK is valid until 30 Jul 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has T9 AEK done?
T9 AEK was recorded at 26,747 miles at its MOT on 14 Jul 2026.
Has T9 AEK ever failed its MOT?
No. T9 AEK has passed all 2 of its MOT tests on record.
Has the mileage on T9 AEK ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on T9 AEK find?
T9 AEK passed its latest MOT on 14 Jul 2026 with 2 advisories: sills not checked as plastic covers; under trays fitted.

Browse all T9A registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.