Yamaha Tenere 700

White · Petrol · 2020 · 689 cc

T70 CWCMOT history

T70 CWC is a white petrol Yamaha Tenere 700 first used on 7 Feb 2020. Its MOT is valid until 12 May 2027 and it has passed 4 of 4 MOT tests, with 3,085 miles recorded at the latest.

From DVSA MOT records, updated 13 May 2026.

MOT
Valid
Until 12 May 2027
Mileage
3,085 mi
At MOT on 13 May 2026
MOT tests
4
4 passed · 0 failed
Per year
363 mi
Average between MOTs
Get reminders for T70 CWC in the free Driver Codes app

Vehicle details

Registration
T70 CWC
Registration format
Prefix (1983 to 2001)
Make
Yamaha
Model
Tenere 700
Colour
White
Fuel type
Petrol
Engine size
689 cc
Year of manufacture
2020
First used
7 Feb 2020
MOT status
MOT valid until 12 May 2027
Latest MOT test
13 May 2026 (Pass)

Mileage history

T70 CWC was last recorded at 3,085 miles on 13 May 2026, 167 miles more than at the previous MOT on 28 Apr 2025.

Odometer reading at each MOT testPass
Previous MOT
2,918 miles · 28 Apr 2025
Between the last two tests
167 miles
Average per year
363 miles

Recorded mileage by year

  • 2026 – 3,085 miles
  • 2025 – 2,918 miles
  • 2024 – 2,006 miles
  • 2023 – 1,940 miles

What the latest MOT found

Pass3,085 miles

No defects or advisories were recorded.

What MOT advisories mean

Full MOT history

4 tests since 17 Mar 2023, newest first. Select a test to see every defect and advisory.

  1. Pass3,085 miles (+167)
    MOT expiry
    12 May 2027
    Odometer
    3,085 miles
    Test number
    503783353528

    No defects or advisories recorded.

  2. Pass2,918 miles (+912)
    MOT expiry
    30 Apr 2026
    Odometer
    2,918 miles
    Test number
    130923263243

    No defects or advisories recorded.

  3. Pass2,006 miles (+66)
    MOT expiry
    30 Apr 2025
    Odometer
    2,006 miles
    Test number
    500271159967

    No defects or advisories recorded.

  4. Pass1,940 miles
    MOT expiry
    16 Mar 2024
    Odometer
    1,940 miles
    Test number
    158086934505

    No defects or advisories recorded.

Questions about T70 CWC

Does T70 CWC currently have a valid MOT?
Yes. DVSA records show the MOT on T70 CWC is valid until 12 May 2027.
When is the MOT due on T70 CWC?
The MOT on T70 CWC is valid until 12 May 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has T70 CWC done?
T70 CWC was recorded at 3,085 miles at its MOT on 13 May 2026, an average of 363 miles a year.
Has T70 CWC ever failed its MOT?
No. T70 CWC has passed all 4 of its MOT tests on record.
Has the mileage on T70 CWC ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on T70 CWC find?
T70 CWC passed its latest MOT on 13 May 2026 with no defects or advisories recorded.

Browse all T70C registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.