Volkswagen logo

Volkswagen Transporter T30 Highline TDI

Blue · Diesel · 2020 · 1,968 cc

T60 OVEMOT history

T60 OVE is a blue diesel Volkswagen Transporter T30 Highline TDI first used on 31 Dec 2020. Its MOT is valid until 30 Dec 2026 and it has passed 3 of 3 MOT tests, with 33,690 miles recorded at the latest.

From DVSA MOT records, updated 19 Dec 2025.

MOT
Valid
Until 30 Dec 2026
Mileage
33,690 mi
At MOT on 19 Dec 2025
MOT tests
3
3 passed · 0 failed
Per year
2,732 mi
Average between MOTs
Get reminders for T60 OVE in the free Driver Codes app

Vehicle details

Registration
T60 OVE
Registration format
Prefix (1983 to 2001)
Make
Volkswagen
Model
Transporter T30 Highline TDI
Colour
Blue
Fuel type
Diesel
Engine size
1,968 cc
Year of manufacture
2020
First used
31 Dec 2020
MOT status
MOT valid until 30 Dec 2026
Latest MOT test
19 Dec 2025 (Pass)

Mileage history

T60 OVE was last recorded at 33,690 miles on 19 Dec 2025, 1,456 miles more than at the previous MOT on 4 Dec 2024.

Odometer reading at each MOT testPass
Previous MOT
32,234 miles · 4 Dec 2024
Between the last two tests
1,456 miles
Average per year
2,732 miles

Recorded mileage by year

  • 2025 – 33,690 miles
  • 2024 – 32,234 miles
  • 2023 – 28,222 miles

What the latest MOT found

Pass33,690 miles

No defects or advisories were recorded.

What MOT advisories mean

Full MOT history

3 tests since 19 Dec 2023, newest first. Select a test to see every defect and advisory.

  1. Pass33,690 miles (+1,456)
    MOT expiry
    30 Dec 2026
    Odometer
    33,690 miles
    Test number
    405932434840

    No defects or advisories recorded.

  2. Pass32,234 miles (+4,012)
    MOT expiry
    30 Dec 2025
    Odometer
    32,234 miles
    Test number
    570936785996

    No defects or advisories recorded.

  3. Pass28,222 miles
    MOT expiry
    30 Dec 2024
    Odometer
    28,222 miles
    Test number
    481642253704

    No defects or advisories recorded.

Questions about T60 OVE

Does T60 OVE currently have a valid MOT?
Yes. DVSA records show the MOT on T60 OVE is valid until 30 Dec 2026.
When is the MOT due on T60 OVE?
The MOT on T60 OVE is valid until 30 Dec 2026. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has T60 OVE done?
T60 OVE was recorded at 33,690 miles at its MOT on 19 Dec 2025, an average of 2,732 miles a year.
Has T60 OVE ever failed its MOT?
No. T60 OVE has passed all 3 of its MOT tests on record.
Has the mileage on T60 OVE ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on T60 OVE find?
T60 OVE passed its latest MOT on 19 Dec 2025 with no defects or advisories recorded.

Browse all T60O registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.