Ford logo

Ford Kuga ST-Line X ED Phev CVT

White · Hybrid electric (clean) · 2022 · 2,488 cc

T22 ELKMOT history

T22 ELK is a white hybrid electric (clean) Ford Kuga ST-Line X ED Phev CVT first used on 30 Jul 2022. Its MOT is valid until 29 Jul 2027 and it has passed 2 of 2 MOT tests, with 26,461 miles recorded at the latest.

From DVSA MOT records, updated 22 Jul 2026.

MOT
Valid
Until 29 Jul 2027
Mileage
26,461 mi
At MOT on 22 Jul 2026
MOT tests
2
2 passed · 0 failed
Per year
Not enough data
Get reminders for T22 ELK in the free Driver Codes app

Vehicle details

Registration
T22 ELK
Registration format
Prefix (1983 to 2001)
Make
Ford
Model
Kuga ST-Line X ED Phev CVT
Colour
White
Fuel type
Hybrid electric (clean)
Engine size
2,488 cc
Year of manufacture
2022
First used
30 Jul 2022
MOT status
MOT valid until 29 Jul 2027
Latest MOT test
22 Jul 2026 (Pass)

Mileage history

T22 ELK was last recorded at 26,461 miles on 22 Jul 2026, 8,383 miles more than at the previous MOT on 22 Jul 2025.

Odometer reading at each MOT testPass
Previous MOT
18,078 miles · 22 Jul 2025
Between the last two tests
8,383 miles

Recorded mileage by year

  • 2026 – 26,461 miles
  • 2025 – 18,078 miles

What the latest MOT found

Pass26,461 miles
  • AdvisoryFront Tyre worn close to legal limit/worn on edge Both nearside and offside slightly worn on edges (5.2.3 (e))

What MOT advisories mean

Full MOT history

2 tests since 22 Jul 2025, newest first. Select a test to see every defect and advisory.

  1. Pass26,461 miles (+8,383)1 advisory
    MOT expiry
    29 Jul 2027
    Odometer
    26,461 miles
    Test number
    688480627652
    • AdvisoryFront Tyre worn close to legal limit/worn on edge Both nearside and offside slightly worn on edges (5.2.3 (e))
  2. Pass18,078 miles
    MOT expiry
    29 Jul 2026
    Odometer
    18,078 miles
    Test number
    776374855031

    No defects or advisories recorded.

Questions about T22 ELK

Does T22 ELK currently have a valid MOT?
Yes. DVSA records show the MOT on T22 ELK is valid until 29 Jul 2027.
When is the MOT due on T22 ELK?
The MOT on T22 ELK is valid until 29 Jul 2027. It can be tested up to a month (minus a day) before then and keep the same renewal date.
What mileage has T22 ELK done?
T22 ELK was recorded at 26,461 miles at its MOT on 22 Jul 2026.
Has T22 ELK ever failed its MOT?
No. T22 ELK has passed all 2 of its MOT tests on record.
Has the mileage on T22 ELK ever gone down?
No. The odometer reading went up or stayed the same at every MOT test on record. Service records are still worth checking.
What did the latest MOT on T22 ELK find?
T22 ELK passed its latest MOT on 22 Jul 2026 with 1 advisory: front tyre worn close to legal limit/worn on edge both nearside and offside slightly worn on edges.

Browse all T22E registrations

Contains DVSA MOT history data, public sector information licensed under the Open Government Licence v3.0. Driver Codes is not affiliated with DVSA or DVLA.